AGM Center
AboutResearchLearningGallery
Documentation
  • Introduction
    • KPG 193 Test System
    • Limitations
    • Network Structure
    • Temporal Profiles
    • Reference UC Solutions
    • Renewable Capacity by Bus
    • Scheduled Outages

AGM Center

Advancing power systems for a sustainable future through research, tools, and collaboration.

About

  • Who We Are
  • Our Team
  • What We Do
  • Get Involved

Documentation

  • Introduction
  • KPG TestGrid
  • KPG Run
  • KPG View

Our Location

Korea Institute of Energy Technology (KENTECH)
200 Hyeoksin-ro, Naju-si, Jeollanam-do
Korea 58330

Office Hours
Mon–Fri 09:00–18:00 KST

© 2026 AGM CENTER. All rights reserved

Docs/kpg test system/Limitations

Limitations

Be aware of these assumptions and simplifications when using the KPG 193 test system:

  1. Synthetic data: Derived from open sources, not utility SCADA/EMS data.

  2. Simplified topology: Some transmission elements are aggregated.

  3. Single year: Profiles are based on 2022 only.

  4. No dynamic devices: Reactive compensation/tap changers not explicitly modeled.

  5. Fixed reactive loads: (Q = 0.1 \times P) assumption.

  6. Estimated line parameters: Standard values, not measured field data.